
|
Trying to open the Bord-na-Mona bridge near Rhode
18 May 1991 |

|
A loaded turf train approaches the bridge
18 May 1991 |

|
The driver sees if he can help us
18 May 1991 |

|
let's see if that works!
18 May 1991 |

|
The bridge raised at last
18 May 1991 |

|
"Celtic Queen" comes through
18 May 1991 |

|
and the train then crosses
18 May 1991 |

|
A turf train on the Bord-na-Mona bridge near Rhode
18 May 1991 |

|
Bord-na-Mona bridge near Rhode
18 May 1991 |

|
Moored at the "Hanged Man's Arch" at the end of the Milltown Feeder
19 May 1991 |

|
Moored at the "Hanged Man's Arch" at the end of the Milltown Feeder
19 May 1991 |

|
Outside The "Hanged Man's Arch"
19 May 1991 |

|
Robertstown
19 May 1991 |

|
Robertstown
19 May 1991 |

|
The old canal hotel at Robertstown
19 May 1991 |

|
Heading east from Sallins - Much clag from the turf stove
20 May 1991 |

|
Approaching Dublin through Inchicore
20 May 1991 |

|
Approaching the start of the Circle Line
20 May 1991 |

|
Approaching the top lock of the circle line at Portobello
20 May 1991 |

|
Portobello
20 May 1991 |

|
Moored outside the original Grand Canal Hotel at Portobello
20 May 1991 |

|
Portobello
20 May 1991 |

|
The Circle line below Portobello
20 May 1991 |

|
The Circle line below Portobello
20 May 1991 |

|
The Circle line below Portobello
20 May 1991 |

|
Heading back up through Inchicore
20 May 1991 |

|
Lockkeeper Paddy McMahon with Slog, Tony Pirie & Sarah
20 May 1991 |

|
Returning through Inchicore, the LUAS now runs along the left-hand towpath.
20 May 1991 |

|
Gripper
20 May 1991 |

|
Hazlehatch
20 May 1991 |

|
Hazlehatch
20 May 1991 |

|
The saloon in Celtic Queen, at the rear of the boat
21 May 1991 |

|
The saloon in Celtic Queen, at the rear of the boat
21 May 1991 |

|
The 16th Lock at Digby Bridge
21 May 1991 |

|
Above the 16th Lock
21 May 1991 |

|
Approaching the 17th Lock
21 May 1991 |

|
17th Lock
21 May 1991 |

|
Approaching Robertstown
21 May 1991 |

|
Sarah steering
21 May 1991 |

|
Gripper steers down the Barrow Line near Rathangan
21 May 1991 |

|
Shrinkage of the bogs has led to this long embankment
21 May 1991 |

|
Rathangan
21 May 1991 |

|
Rathangan
22 May 1991 |

|
Monasterevin Lift Bridge with a train about to cross the Barrow
22 May 1991 |

|
Monasterevin Lift Bridge
22 May 1991 |

|
Barrow aqueduct at Monasterevin, with the GSW main line in the background
22 May 1991 |

|
Edenderry
23 May 1991 |

|
Edenderry basin, with the "Harbour House" pub behind
23 May 1991 |

|
Edenderry
23 May 1991 |

|
The whole crew at Celtic Cruisers after the trip
25 May 1991 |